Following a multi level structure, you can load the different quantities, upload the BOM that corresponds to each level / assembly and consolidate all these quantities.

1- When creating the RFQ form, add quantity 1

2- Go to the BOM tab and from the + add the lines. You will need to add

  • Line item number

  • MPN: Assembly name/number

  • Qty per

  • Part class > Select Assembly top level for all the lines

3- Then you will need to add the BOM that corresponds to each line item. You don't have to re-import, you can copy from another existing RFQ:

  • ACTIONS > COPY BOM > ADD YOUR ASSEMBLY NAME / NUMBER > SUBMIT